Drilling an ultra-HPHT well three days ahead of plan

OILFIELD

Discover how a thermally stable fluid system enabled the drilling of an ultra-HPHT exploration well in Southeast Asia at 455 °F (235 °C)—reducing drilling time to total depth by 3 days ahead of plan.

Download the Full Case Study

By submitting the form, I accept that the data I filled in will be stored by Elkem and processed according to their Privacy and Cookies policy.